Jobs › Job dxNjRo1I
9 AVOKAHVILLE AV, AVOCA QLD 4670
Job No. dxNjRo1I
Client —
Created 2026-10-02
Job type Re-roof
Estimate $44,558 to $48,649 81% · draft, unreviewed
Estimate
Measurement report (print / PDF) ›customer view ›| Item | Qty | Unit | Rate | Total | Basis |
|---|---|---|---|---|---|
| cladding | $4,593 | ||||
| CUSTOM ORB 0.42 sheet | 299.0 | lm | $15.36 placeholder | $4,593 | allowance 56 sheets by ceil(eave width / 0.762 m effective cover) on rectangular planes at ordered length; raked planes by true area / cover × pairing allowance; plus 10.0% waste (hip). |
| flashings | $1,799 | ||||
| Ridge capping | 17.2 | lm | $20.27 placeholder | $348 | allowance Ridge 16.35 m (horizontal, no multiplier) × 1.05 for 100 to 150 mm laps. |
| Barge capping | 28.1 | lm | $15.45 placeholder | $434 | allowance Barge 26.78 m true length (rakes follow the slope) × 1.05 for laps. |
| Apron flashing to wall | 35.1 | lm | $17.55 placeholder | $615 | derived, check basis Horizontal abutment length, no multiplier. |
| Penetration flashing / back tray | 3.0 | ea | $85.00 placeholder | $255 | derived, check basis One per penetration. Each needs a soaker on the uphill side. |
| Foam infill / rib closure | 43.1 | lm | $3.40 placeholder | $147 | derived, check basis Ridge plus barge length. |
| fixings | $630 | ||||
| Cyclone assembly (screw + load-spreading washer) | 1200.0 | ea | $0.38 placeholder | $456 | allowance Equivalent full-length sheets × (5 per sheet on each of two end supports + 3 on each internal support), plus 15% waste. Cyclonic spans are published WITH cyclone washers. |
| Batten to rafter screw | 508.0 | ea | $0.22 placeholder | $112 | allowance 2 per crossing at 900 mm rafter centres. |
| Sealant, neutral cure 300 ml | 5.0 | ea | $12.50 placeholder | $63 | allowance One tube per 40 m². Allowance, not a sourced rate. |
| rainwater | $443 | ||||
| Quad gutter 150 (QLD size) | 36.8 | lm | $8.09 placeholder | $297 | derived, check basis Eave length, horizontal. |
| Downpipe | 7.0 | ea | $20.82 placeholder | $146 | allowance Allowance, not a drainage design: worse of one per 12 m of gutter (4) and plan area / 30 m² catchment (7). Sizing to NCC Part 7.4 / AS 3500.3 for Bundaberg rainfall is the estimator's. |
| labour | $10,982 | ||||
| Lay, flash and batten out | 187.7 | m2 | $34.00 placeholder | $6,383 | derived, check basis True area. This is the line the published supply-and-install $/m² rates actually cover. |
| Strip the existing roof | 181.7 | m2 | $18.00 placeholder | $3,270 | derived, check basis Plan area. |
| Skip and tip fees | 1.0 | ea | $520.00 placeholder | $520 | allowance |
| Install gutters and downpipes | 36.8 | lm | $22.00 placeholder | $809 | derived, check basis Eave length. |
| site | $7,266 | ||||
| Guardrail edge protection, single storey | 63.5 | lm | $30.00 placeholder | $1,906 | derived, check basis Perimeter guardrail hire for the duration, per lm of eave and barge. Single storey. Allowance; the fall-protection method is assessed on site. |
| Solar panel removal and refit | 16.0 | panel | $335.00 placeholder | $5,360 | derived, check basis Per panel. |
| structure | $3,916 | ||||
| Timber batten 90×45 | 228.3 | lm | $4.20 placeholder | $959 | allowance 66 rows across all planes: two end spans at 900 mm and internal spans at 1200 mm, times the average plane width (a triangle's top batten is a point), plus 5% for valleys, plane changes and penetrations. |
| Anticon blanket (1200 roll, 1050 effective cover) | 225.3 | m2 | $9.00 placeholder | $2,028 | allowance True area × 1.2/1.05 for the 150 mm foil tab lost on every lap, plus 5%. |
| Roof safety mesh AS/NZS 4389 | 206.5 | m2 | $4.50 placeholder | $929 | allowance True area plus 10% for 150 mm side laps and end ties. |
| Direct cost | $29,629 | ||||
| Overhead 12% of direct cost | $3,555 | ||||
| Margin 20% of the selling price | $8,296 | sell = cost ÷ (1 − margin), not a markup | |||
| QBCC home warranty insurance (banded table, ex GST) | $468 | $515 inc GST from the July 2020 alterations table | |||
| Subtotal ex GST | $41,948 | ||||
| GST 10% | $4,195 | ||||
| Total inc GST, mid scenario, repriced with current settings and rules | $46,143 | stored mid was $46,143 (rules 2026-09-28.2, default settings). The customer saw $44,558 to $48,649. A stored estimate is never rewritten; a difference here means rules or rates changed since. | |||